GLP audit-readiness means a nonclinical safety study’s records, consistent with 21 CFR Part 58 and OECD GLP, could withstand inspection on any given day, not just after a pre-audit scramble. Most compliance software addresses this by logging what happened after the fact. SIMS addresses it by mapping every study activity to its governing SOP and executing it against the study calendar, so the audit trail is a byproduct of how the work was done, not a document assembled afterward.
What does GLP audit-readiness actually mean?
Good Laboratory Practice, codified in the US under 21 CFR Part 58 and internationally under the OECD GLP Principles, governs how nonclinical safety studies are planned, performed, monitored, recorded, reported, and archived. Audit-readiness is not a document or a checklist, it’s a property of the record itself: can an inspector, arriving unannounced, trace any result back to who did what, when, under which SOP, with an intact chain of custody. A CRO that needs two weeks to assemble that picture is not audit-ready, regardless of how good its science is.
Why most compliance software only gets you halfway there
Most LIMS and QMS platforms marketed for GLP compliance focus on the record-keeping layer: audit trails, electronic signatures, access controls, and validation packages that satisfy 21 CFR Part 11’s technical requirements. These are necessary, and SIMS includes them. But logging what happened is not the same as governing how the work is organized while it happens. A system can log a perfectly compliant audit trail of a chaotic, ad hoc process. The record will be technically compliant and still take weeks to assemble into something an inspector, or a sponsor, can actually follow.
Compliance as a byproduct of operations, not a bolted-on feature
SIMS takes a different starting point. Every activity in the Schedule of Activities is mapped to the SOP that governs it before the work happens, and executed against the Study and Site Calendar, so the sequence and ownership of each step is established by design, not reconstructed afterward. Study Conduct is captured through eForms at the point of work, time-stamped and attributed at the source. The result is that the audit trail, who did what, when, under whose custody, accrues continuously as the study runs, rather than being assembled in the days before an inspection.
21 CFR Part 11 and GLP, built in from day one
On top of that operational structure, SIMS provides the technical controls 21 CFR Part 11 requires: time-stamped audit trails, electronic signatures, and access controls, running on SOC 2–certified infrastructure. Each CRO receives IQ/OQ/PQ validation documentation to support its own computerized system validation, rather than having to build that validation evidence from scratch.

What this looks like during an actual inspection
When compliance accrues continuously, an inspection becomes a matter of showing the record, not reconstructing it. A Study Director can trace any activity to its governing SOP, its timestamp, and the person responsible, without a separate reconciliation project. That’s the practical difference between a system that logs compliance and an operating model that produces it.
FAQ
What is GLP (Good Laboratory Practice)?
GLP is a quality system, codified in the US under 21 CFR Part 58 and internationally under the OECD GLP Principles, that governs how nonclinical safety studies supporting regulatory submissions are planned, conducted, monitored, recorded, reported, and archived.
What is 21 CFR Part 11?
21 CFR Part 11 is the FDA regulation setting the criteria under which electronic records and electronic signatures are considered trustworthy, reliable, and equivalent to paper records and handwritten signatures.
What is the difference between GLP and GMP?
GLP, 21 CFR Part 58, governs nonclinical safety studies that support a regulatory submission. GMP, 21 CFR Parts 210 and 211, governs the manufacturing of the drug product itself. They are separate regulations covering different stages of development.
How does SIMS support computerized system validation?
SIMS ships with IQ/OQ/PQ, Installation, Operational, and Performance Qualification, validation documentation, which each CRO uses as the basis for its own computerized system validation rather than building that evidence from scratch.
What is OECD GLP?
The OECD Principles of Good Laboratory Practice are the internationally recognized GLP standard, used by regulatory authorities outside the US and aligned with FDA’s 21 CFR Part 58 for studies submitted across multiple jurisdictions.